• Home skipcontent Sitemap screen-reader language
  • A-
  • A
  • A+
Search

Search.....

Click here to Search
  • Accident Intimation
  • NOC for Commercial
  • Downloads
  • Electric Charges
  • Authorized Login Panel
  • Download Softosignature
Vidyut Suraksha
  • Accident Intimation
  • NOC for Commercial
  • Downloads
  • Electric Charges
  • Authorized Login Panel
  • Download Softosignature
  • Home
  • Introduction
  • Organization
    • Headquarter Lucknow
    • Department Directory Details
    • Sanctioned Post
    • Right to Information Act 2005
      • Details of Public Information Officer
      • Details of Appel Author Officer
    • Sewa Niyamawali
      • Assistant Director Cadre
      • Electrical Safety Officer Cadre
      • Lipikiya Cadre
      • Steno Cadre
  • Administrative Work
  • Charges & Fee
    • Electric Charges
    • Inspection And Trial Fee
  • Suggestion For Public
  • Standard Drawing
    • Guidelines
    • Standard Drawing 1
    • Standard Drawing 2
    • Standard Drawing 3
    • Standard Drawing 4
  • Downloads
  • Check & Verify
    • Verify Noc Report
    • Verify Electricity Duty Exemption Report
    • Supervisor Verification
    • Wireman Verification
    • Contractor Verification
  • Online Application
    • Uttar Pradesh Lift and Escalator Registration Portal
    • NOC for Commercial
    • NOC for Industrial (Nivesh Mitra)
    • NOC Status
    • Apply for Periodical Inspection (Regulation 30)
    • Accident Intimation
    • Apply for exemption, adjustment, and refund of electricity duty
    • Apply for Supervisor certificate and wireman permit
    • Download Softosignature
  • Contact

Serial No-27 (a)

Register no. LWW / NP0-890,

License No. W.P0-41

License to Post Conservation Rate

Government Gazette, Uttar Pradesh

Published by the Government of Uttar Pradesh

Extraordinary

Legislative appendix

Part-4, Clause (b)

(Dormant order)

Lucknow, Friday, February 6, 1998

Magh 17,1919 in doubt

Uttar Pradesh Government

Energy Section -3

Spec 232-P-3 / 98-24-85 P-84

Lucknow: February 6, 1998

Notification

P0 R0--59

Using power under Section 3 of the UP Electricity (Duty) Act, 1952 (UP Act No. 3333) and the government, notified in the notification no. 02 P-3 / 97-24P-84, dated January 3, 1997 Making amendments in the rates of Electricity Duty (4) 3 paisa per unit of energy consumed for industrial and other purposes from its own private power generation source installed by another person. Rate was determined by Hereby the Electricity Duty gives an order to terminate the date of publication of this notification in the Gazette, the Governor of India hereby. Accordingly, the revised up to this limit, as per Section 3 of the notification dated January 3, 1997, will be deemed modified.

By the order of the Governor,
Shankar Agrawal,
Secretary.

Important Links

  • Home
  • Introduction
  • Organization
  • Application Form
  • Electricity Duty

Other Links

  • NOC for Commerical
  • NOC for Industrial (Nivesh Mitra)
  • Accident Intimation
  • Authorized Login Panel

Contact Details

  • Head Office:
    Vibhuti Block-2, Gomti Nagar, Lucknow - 226010
  • Phone no Telephone Number:
    0522-2720679, 2720716
  • Phone no Phone / Fax:
    0522 - 2720679
  • Email id Email:
    [email protected]
  • Terms & Conditions
  • Privacy Policy
  • Copyright Policy
  • Hyperlinking Policy
  • Help
  • Site Map
  • Screen Reader Access

Copyright © 2025 - All Rights Reserved, Directorate of Electrical Safety

Designed and Developed Through

feedbackfeedback Form

Visitor No.: Website Visitor

Last Updated Date : Saturday, 01, April 2025 | 11:30 AM