• Home skipcontent Sitemap screen-reader language
  • A-
  • A
  • A+
Search

Search.....

Click here to Search
  • Accident Intimation
  • NOC for Commercial
  • Downloads
  • Electric Charges
  • Authorized Login Panel
  • Download Softosignature
Vidyut Suraksha
  • Accident Intimation
  • NOC for Commercial
  • Downloads
  • Electric Charges
  • Authorized Login Panel
  • Download Softosignature
  • Home
  • Introduction
  • Organization
    • Headquarter Lucknow
    • Department Directory Details
    • Sanctioned Post
    • Right to Information Act 2005
      • Details of Public Information Officer
      • Details of Appel Author Officer
    • Sewa Niyamawali
      • Assistant Director Cadre
      • Electrical Safety Officer Cadre
      • Lipikiya Cadre
      • Steno Cadre
  • Administrative Work
  • Charges & Fee
    • Electric Charges
    • Inspection And Trial Fee
  • Suggestion For Public
  • Standard Drawing
    • Guidelines
    • Standard Drawing 1
    • Standard Drawing 2
    • Standard Drawing 3
    • Standard Drawing 4
  • Downloads
  • Check & Verify
    • Verify Noc Report
    • Verify Electricity Duty Exemption Report
    • Supervisor Verification
    • Wireman Verification
    • Contractor Verification
  • Online Application
    • Uttar Pradesh Lift and Escalator Registration Portal
    • NOC for Commercial
    • NOC for Industrial (Nivesh Mitra)
    • NOC Status
    • Apply for Periodical Inspection (Regulation 30)
    • Accident Intimation
    • Apply for exemption, adjustment, and refund of electricity duty
    • Apply for Supervisor certificate and wireman permit
    • Download Softosignature
  • Contact

EARLY AND PERIODIC INSPECTION OF VARIOUS INSTALLATIONS UNDER INDIAN ELECTRICAL RULES, 1956

Regarding electrical installations, the following initial inspections are carried out under the Indian Electrical Rules, 1956 by the Directorate of Electrical Safety: -

  • Early inspection of medium voltage electrical installation under rule-51
  • Inspection of electrical installations of generators over 10 kilowatt capacity under rule-47-A
  • Inspection of electrical installations of multi-storey buildings (height 15 meters) under rule-50 'A'.
  • Inspection of electrical installations of high voltage and extra high voltage under rule-63

2- Under the Rule-46 of the Indian Electricity Rules, 1956, all electrical acquisitions of low voltage (commercial), medium voltage and high voltage are inspected at the specified intervals. Regular periodic inspection of electrical acquisitions under Uttar Pradesh Energy Section-3 Notification No. -1389 P-3 / 94-23-106 / P-93, dated May 06, 1994 is done at the following intervals: -

  • All high, very high and medium voltage installations will be inspected and tested once in three years.
  • All low voltage installations will be inspected and tested once in five years.

3- The inspection fee for electrical installations is determined by the Uttar Pradesh Government, Energy Section-3, that the notification number -1435 P-3 / 98-24-47 / P-91, dated June 29, 1998.

4- Inspection fee is paid in the state treasury of the state under the following heading: -

Head of Account: -

0043 - Taxes and fees on electricity,

102- Fees under Indian Electricity Rules

Verification of Treasury invoice, accounting title can be done from the Directorate's office.

5- For inspection of electrical installations, it is necessary to submit the prescribed fee in the official treasury to the concerned office along with the received application form of the challan. Worksheet should be attached in the original form with the request letter received from the licensed contractor who has completed the installation of the electrical installation.

6- Before starting the work of high voltage electrical installations, it is necessary to approve the drawing of the installation. For this, the installation of the electrical installation is to be presented in three copies. Upon completion of the work, according to the approved diagram, the Treasury of the prescribed inspection fee will be submitted in the concerned office of the Chalan work supplementary certificate and test certificate of high voltage equipment.

7- Electrical installations of film planets are inspected under Uttar Pradesh Cinematograph Rules, 1952. Propose the picture of the proposed electrical installation of the planet Planet in three copies and submit it to the Regional Office of Directorate. According to the approved drawing, after completion of the installation of the electrical installation, the application of the treasury invoice of the inspection fee and the work along with the supplementary certificate should be submitted in the concerned zonal office.

8- In relation to the meaning of electrical installations, the measurement plate and the mean strip of measurement has been set up in the letter no. 567 LA / General (B & L Form), dated 26.02.1991.

Next

Important Links

  • Home
  • Introduction
  • Organization
  • Application Form
  • Electricity Duty

Other Links

  • NOC for Commerical
  • NOC for Industrial (Nivesh Mitra)
  • Accident Intimation
  • Authorized Login Panel

Contact Details

  • Head Office:
    Vibhuti Block-2, Gomti Nagar, Lucknow - 226010
  • Phone no Telephone Number:
    0522-2720679, 2720716
  • Phone no Phone / Fax:
    0522 - 2720679
  • Email id Email:
    [email protected]
  • Terms & Conditions
  • Privacy Policy
  • Copyright Policy
  • Hyperlinking Policy
  • Help
  • Site Map
  • Screen Reader Access

Copyright © 2025 - All Rights Reserved, Directorate of Electrical Safety

Designed and Developed Through

feedbackfeedback Form

Visitor No.: Website Visitor

Last Updated Date : Saturday, 01, April 2025 | 11:30 AM