• Home skipcontent Sitemap screen-reader language
  • A-
  • A
  • A+
Search

Search.....

Click here to Search
  • Accident Intimation
  • NOC for Commercial
  • Downloads
  • Electric Charges
  • Authorized Login Panel
  • Download Softosignature
Vidyut Suraksha
  • Accident Intimation
  • NOC for Commercial
  • Downloads
  • Electric Charges
  • Authorized Login Panel
  • Download Softosignature
  • Home
  • Introduction
  • Organization
    • Headquarter Lucknow
    • Department Directory Details
    • Sanctioned Post
    • Right to Information Act 2005
      • Details of Public Information Officer
      • Details of Appel Author Officer
    • Sewa Niyamawali
      • Assistant Director Cadre
      • Electrical Safety Officer Cadre
      • Lipikiya Cadre
      • Steno Cadre
  • Administrative Work
  • Charges & Fee
    • Electric Charges
    • Inspection And Trial Fee
  • Suggestion For Public
  • Standard Drawing
    • Guidelines
    • Standard Drawing 1
    • Standard Drawing 2
    • Standard Drawing 3
    • Standard Drawing 4
  • Downloads
  • Check & Verify
    • Verify Noc Report
    • Verify Electricity Duty Exemption Report
    • Supervisor Verification
    • Wireman Verification
    • Contractor Verification
  • Online Application
    • Uttar Pradesh Lift and Escalator Registration Portal
    • NOC for Commercial
    • NOC for Industrial (Nivesh Mitra)
    • NOC Status
    • Apply for Periodical Inspection (Regulation 30)
    • Accident Intimation
    • Apply for exemption, adjustment, and refund of electricity duty
    • Apply for Supervisor certificate and wireman permit
    • Download Softosignature
  • Contact

V.K. 559

Courses for examining supervisors

1. Transmission and Distribution Mains

(A) Overhead line - General accounting and general principle of construction of low, medium and high pressure lines, Strength of pillars Ensure the position of spacing, cross arms (air pressure), air pressure, Sags, effects of the effects of falling and freezing of snow and ice, tension, insulator, jacket, guardware, stages, measures to avoid electricity ( Lighting Protective Device, Earthing, Lightning arresters, and lightning conductors, and their testing.

(B) The underground (underground) cable, the common principle of laying cables in the pipes, and the simple principle and calculation, under the land of junction boxes and overhead handling, folding, adding and plumbing ), And filling compound in distribution boards and pillars, joint box compounds, melting of compounds and boxes.

2.Housing and cinema wiring: -

(A) 1. Suitability for lay-out, calculation, and installation, wood casing and capping lead or cable-tire sheetsau and armored cable and various types of installation work.

2. Electricity accessories, electric utensils, indicators, and telephones.

(B) Aerial lines of insulated and coed.

(C) List of estimation requirements and drawing of wiring.

(D) Underground (Earth), Continuity of connections, Leatuge, insulation resistance, testing.

(E) Find out where the error lies.

(F) Illumination-General principles of light and early calculation, (Operation), their advantages and disadvantages, and their use, electrical sign, placement, connection, operation and caution. .

3.General :-

(A) Information related to Indian Electricity and Rules

(B) The method and duration of healing treatment of electric shock

(C) Create and read sections of the circuit diagrams of drawings, plan applications and lightning and lights.

Course topic for Wireman

  • Cleat, Bud Casing And Capping, Lead Sheathod, Cab-Tyre And Conduit Wiring And Fittings.
  • Connection Of The Ceiling Fans And Their Drawing Along With Distribution Boards, Plaques And Sockets, Lamp Holders, Regulators And Switches.
  • Use Of Electric Shaft And Test Lamp To Find Out The Method And Polarity Testing Of Polarity Testing.
  • The Construction Of The Overhead Line By The Bare And Insulated Strings, The Jointing Of The Wire And Cable (Oldering) Plugs And Sockets And Their Modifications.
  • Electric Bell And Indicator (Indicator) Over Electric Supply Line Or Batterie.
  • Detection Of Insulation Resistance, Loakage, Earth Continuty And Detection And Induction Of The Surround Device And The Repair And Repair Of The Situation.
  • Treatment And Treatment Methods And Duration Of Electric Shock
  • Connection Of ACC And DCM And Their Reading.

Next

Important Links

  • Home
  • Introduction
  • Organization
  • Application Form
  • Electricity Duty

Other Links

  • NOC for Commerical
  • NOC for Industrial (Nivesh Mitra)
  • Accident Intimation
  • Authorized Login Panel

Contact Details

  • Head Office:
    Vibhuti Block-2, Gomti Nagar, Lucknow - 226010
  • Phone no Telephone Number:
    0522-2720679, 2720716
  • Phone no Phone / Fax:
    0522 - 2720679
  • Email id Email:
    [email protected]
  • Terms & Conditions
  • Privacy Policy
  • Copyright Policy
  • Hyperlinking Policy
  • Help
  • Site Map
  • Screen Reader Access

Copyright © 2025 - All Rights Reserved, Directorate of Electrical Safety

Designed and Developed Through

feedbackfeedback Form

Visitor No.: Website Visitor

Last Updated Date : Saturday, 01, April 2025 | 11:30 AM